Higashidōri Nuclear Power Plant

Japan · Tohoku Electric Power · nuclear power plant · operational · 1,100 MW installed

41.188, 141.390 · generated 2026-11-12 20:25:11 UTC

Current external hazard exposure

LOW · 3.8/100

Earthquake 209 km from Higashidōri Nuclear Power Plant, 13 h ago (severity 16%, distance factor 0.25, recency 0.88) plus 1 other active hazard → exposure LOW (3.8/100).

Baseline: this exposure is at or above 34% of the 398 observations recorded for this facility since 2026-08-14 · highest recorded 15.6/100.

Facility impact: no operational effect has been confirmed in the public sources reviewed.Exposure measures external hazard conditions near the site; it is not an assessment of plant engineering safety.

Nearby active hazards (in range)

TypeSourceWhen (UTC)Distance
EARTHQUAKE M4.8USGS2026-11-12 04:07209 km
EARTHQUAKE M4.7USGS2026-11-08 09:23233 km

Recent exposure history

How this score is calculated

External hazard exposure (0–100) combines four factors: hazard type, severity, proximity to the site and recency — higher when a serious hazard is close and recent. It does not incorporate facility vulnerability or consequence. Full methodology.

LOW 0–20MODERATE 20–40ELEVATED 40–60HIGH 60–80SEVERE 80–100